285K Guided HWU

EQUIPMENT

HPHT Hydraulic Workover Unit

A skidded heavy duty hydraulic workover unit complete with10/15K BOP stack and a 15K pump, this unit is exceptional at drilling out frac plugs on deep horizontal wells where other services are unable to reach the toe.

Our high-speed, high torque rotariesand our torque managed rigs offer theefficiency of full jack strokes while milling at extreme depths. You will reach the toe every time with Piston on the job.

Benefits

Dual handling winches

Built-in gin pole

Dual motor rotary

Proprietary tubing handling system for efficient trip times

Patented HALO system

Torque Track to increase stability while drilling

Modular components for quick rig-up/out times

Features

9 Skid Mounted Loads +

Jack

Primary BOP & stripping stack

Dual pump shack

Mud tank

Main power pack

Secondary power pack

Catwalk with 4 pipe racks

Tool shed/fuel skid

Gin pole skid

Doghouse/Accumulator

Anchors (require trailer with no roll)

Specifications

DRIVE SYSTEM
285,000 LBS
MAX SNUB FORCE
169,000 LBS
MAX DEPTH
9,000 M
TRIP SPEED
2-leg = 85 Joints / Hr
4-leg = 45 Joints / Hr
ROTARY
12,000 FT LBS, 200 RPM with HALO Slip Swivel & Torque Tube
MUD TANK
40m3 with 3 Compartments with Agitators and Mixing Pumps
PUMPS
1,260HP Dual 15K
DRIVE SYSTEM
2 or 4 Leg Selectable Modes, 12’ Stroke
BOP’S
7-1/16, 10K or 15K
POWER PACK
880 HP
MAST
55’ + 10’ + 15’ Extensions x 10,000lb with 2Counter-Balance Winches and 1 Heavy Winch
WORK WINDOW
8 FT
PIPE SIZE
1.050” – 5.5” Snubbing
1.050” – 5.5” Workover
THRU BORE
8.25” Snubbing
8.25” Snubbing
SLIPS
Nu Energy 300K Bowls
TOTAL UNIT WEIGHT
104,000 lbs