A skidded heavy-duty hydraulic workover unit complete with 10/15K BOP stack and a 15K pump, this unit is exceptional at high-pressure snubbing, hydraulic workover campaigns, and drilling out frac plugs on deep horizontal wells where other services are unable to reach the toe.
Our high-speed, high torque rotaries and our torque managed rigs offer the efficiency of full jack strokes while milling at extreme depths. You will reach the toe every time with Piston on the job.
Dual handling winches
Built-in gin pole with 10' and 24' extensions
Dual motor rotary
Proprietary tubing handling system for efficient trip times
Patented HALO system
Torque Track to increase stability while drilling
Modular components for quick rig-up/out times
9 Skid Mounted Loads +
Jack
Primary BOP & stripping stack
Dual pump shack
Mud tank
Main power pack
Secondary power pack
Catwalk with 4 pipe racks
Tool shed/fuel skid
Gin pole skid
Doghouse/Accumulator
Anchors (require trailer with no roll)